Long BranchFeb. 24, 2018Arliss StreetCrews will be drilling soldier piles for the Plymouth Tunnel, Saturday, February 24, 2018 from 7 am - 3 pm.
Bethesda / Chevy ChaseFeb. 24, 2018Rock Creek ParkTree clearing and grubbing continues at Rock Creek Park on Saturday, February 24, 2018 from 7 am - 4 pm.
Bethesda / Chevy ChaseFeb. 17, 2018Rock Creek ParkTree clearing and grubbing continues at Rock Creek Park on Saturday, February 17, 2018 from 7 am - 4 pm.
Long BranchFeb. 17, 2018Arliss StreetCrews will be drilling soldier piles for the Plymouth Tunnel and relocating utilities, Saturday, February 17, 2018 from 7 am - 3 pm.
Bethesda / Chevy ChaseStarting Feb. 15, 2018Woodmont PlazaConstruction work will begin at Woodmont Plaza. The area will be fenced off to allow site preparation for future office trailers.
Long BranchFeb. 21, 2018 - Feb. 23, 2018Arliss StreetThe second phases of temporary sound wall installation are set to begin between the construction area on Arliss St. and the Arliss Knolls townhouses the week of February 19th.
Bethesda / Chevy ChaseOngoingJones Mill Rd. through Rock Creek ParkTree removal and site preparation continues.
Long BranchStarting Feb. 2, 2018 - March 2018Plymouth StreetCrews will be installing the exterior support walls of the Plymouth tunnel work zone. Piles will be drilled into the soil, and steel support will be put in place for excavation.
Riverdale ParkOngoingRiverdale Rd., at the demolished Shell StationUnderground gas tank removal begins in the lot of the former Shell Station near the intersection of Riverdale Rd. and East-West Hwy.
Long BranchOngoingArliss StreetWaterline relocation work continues along Arliss Street. Washington Suburban Sanitary Commission (WSSC) will notify affected residents of any service interruptions.
Bethesda / Chevy ChaseOngoingConnecticut Ave. to Jones Mill Rd.Tree removal and site preparation continues.
Long BranchOngoingPlymouth StreetUtility relocation and other site work will continue along Plymouth Street.
Long BranchNov. 20, 2017 - through 2021Plymouth StreetPlymouth Street is closed to non-local traffic between Bradford and Hartwell Roads to allow for the construction of the Purple Line's Manchester Station. The haul road and entrance to the construction site will be located on E. Wayne Ave.
Long BranchNov. 13, 2017 - through 2021Arliss StreetArliss Street is closed between Flower Ave and Walden Road. Access to local properties will be maintained.
Bethesda / Chevy ChaseOngoingElm StreetFoundation work for the crane that will service the construction of the Bethesda Station will require the driving of piles. This work will be done during daytime hours.
Long BranchOngoingArliss StreetFor convenience, a new temporary driveway from Flower Avenue to the Giant Food Shopping center has been constructed.
Glenridge / New CarrolltonOngoingVeterans ParkwayWork continues along Veteran's Parkway between Riverdale Rd. and Annapolis Rd. This work may cause periodic lane closures of the right hand southbound lane. Barriers are being placed to delineate the construction zone. Pedestrians and bicyclists are required to stay outside of the construction zone at all times.
Silver SpringOct. 1, 2017Future CCTThe CCT is currently closed to public access between Woodmont Ave. in Bethesda and Talbot Ave. in Silver Spring.
Greater Lyttonsville / WoodsideOct. 1, 2017Future CCTThe CCT is currently closed to public access between Woodmont Ave. in Bethesda and Talbot Ave. in Silver Spring.
Bethesda / Chevy ChaseOct. 25, 2017Future CCTThe CCT is currently closed to public access between Woodmont Ave. in Bethesda and Talbot Ave. in Silver Spring.