Skip to main content

The table below is a list of active construction along the Purple Line alignment. Notifications can be sorted by work zone for updates on specific locations and also received via text and email through Purple Line Transit Partners’ notification system. Sign up to receive these alerts.

All

As work increases along the alignment, the Purple Line team remains committed to keeping everyone safe. Pedestrians and motorists are advised to follow construction signage and use the open sidewalk(s). For the safety of the public and our construction team, entry into construction work zones is not permitted.

All

Landscape, erosion and sediment control, and site maintenance along the Purple Line alignment will be conducted on an as needed basis weekdays and weekends from 7 a.m. to 7 p.m.

Bethesda
/ Chevy Chase

Crews continue utility work on Chevy Chase Lake Drive. This work will, at times, require temporary lane closures on Chevy Chase Lake Drive. However, access will be maintained at all times for both vehicles and pedestrians around the work zone. On-street parking directly adjacent to the work zone will be limited. Please follow the posted signage. Work may occur 7 a.m. to 7 p.m., weekdays and weekends, as needed through September. 

Bethesda
/ Chevy Chase

Crews continue excavation in the Purple Line’s elevator shaft to connect to Metro's Red Line in Bethesda.  This operation will include blasting the rock within the shaft located at the work zone on Elm Street at Wisconsin Avenue.  Blasting is planned during daytime hours with additional work in the area occurring over multiple shifts between excavation and removal of spoils from the site. In advance of each blast, warning horn will be activated. Use of backup alarms will be limited during nighttime hours. Work may occur in two shifts weekdays and weekends, as needed. 

Bethesda
/ Chevy Chase

Crews continue construction of walls and utility installations, along the former Georgetown Branch Trail between Elm Street Park and Rock Creek Park. Work may take place 7 a.m. to 7 p.m. weekdays and weekends, as needed through September.

Bethesda
/ Chevy Chase

Crews continue work in the Jones Mill Road underpass area through September. Work includes utility relocations, construction of retaining walls, and completing the east side of Jones Mill Road. Work may take place 7 a.m. to 7 p.m. and overnight 8 p.m. to 5 a.m. weekdays and weekends, as needed.

Bethesda
/ Chevy Chase

Work continues in the area of future Connecticut Avenue Purple Line Station through September. Work includes utility installations, retaining walls and station elements. Work may take place 7 a.m. to 7 p.m. weekdays and weekends, as needed.

Bethesda
/ Chevy Chase

Crews continue work at the future Purple Line Bethesda Station located at Elm Street and Wisconsin Avenue. A long-term lane closure of the southbound right lane of Wisconsin Avenue at Elm Street will continue through completion of the station construction to facilitate a work zone buffer and construction access.  Pedestrians will need to use the signed pedestrian detour to access the northbound side of Wisconsin Avenue.   Work will occur in two shifts from 7 a.m. to 5 p.m. and 5 p.m. to 7 a.m., weekdays and weekends, as needed. View detour here

College
Park

Crews continue water and sewer relocations on Baltimore Avenue (Route 1) at the intersection of Rossborough Lane. Traffic on Baltimore Avenue (Route 1) will be reduced to one lane in each direction from Fraternity Row to Hotel Drive from 7 a.m. to 7 p.m. through September 8, 2023

College
Park

Crews continue utility relocations along Campus Drive between Baltimore Avenue (US Route 1) and River Road through September. Temporary lane closures may occur 9 a.m. to 3 p.m., weekdays and 7 a.m. to 7 p.m. weekends, as needed.

College
Park

The long-term road closure of Rossborough Lane between Diamondback Drive and the Rhode Island Avenue remains in effect to complete stormwater drainage system installation and roadway reconfiguration. Local access will be maintained, and vehicular and pedestrian detours are in place. Please follow posted signage. The detour will be in place until approximately January 2024. Work may occur 7 a.m. to 7 p.m., weekdays and weekends, as needed. 

College
Park

The long-term traffic configuration on Campus Drive between Diamondback Drive and River Road remains in effect. All traffic is shifted to the north side of Campus Drive and a minimum of one lane in each direction will be maintained. A signed pedestrian detour has been implemented to maintain pedestrian access around the work zone. This traffic pattern will be in place until approximately November 2023.

Glenridge
/ New Carrollton

During the month of September, Hanson Oaks Drive will periodically be reduced to one lane with flag personnel on-site to control the flow of traffic from 7:00 a.m. to 7:00 p.m. at the Ellin road intersection.  This is to facilicate installation of tracks through the intersection.   

Glenridge
/ New Carrollton

The long-term traffic shift on Ellin Road between Emerson Place and Hanson Oaks Drive remains in effect. Two-way traffic is shifted to the north side of Ellin Road and the south side is closed to allow the continuation of Purple Line construction. View traffic shift here

Glenridge
/ New Carrollton

Work continues on the Purple Line Glenridge Station located near the corner of Veterans Parkway (MD 410) and Annapolis Road (MD 450) through September.  Work may occur 7 a.m. to 7 p.m., weekdays and weekends, as needed.

Glenridge
/ New Carrollton

Implemented on August 21, southbound lanes of Veterans Parkway (MD410) will  be reduced to one lane for approximately a quarter of a mile, while northbound lanes will remain as two thru lanes. The closure is to facilitate the installation of Purple Line track across Veterans Parkway. Work may occur 7 a.m. to 7 p.m., weekdays and weekends, as needed. View traffic shift here

Glenridge
/ New Carrollton

Crews continue construction at the Glenridge Operations and Maintenance Facility through September. Work will take place from 7 a.m. to 7 p.m. on weekdays and weekends, as needed.

Greater
Lyttonsville / Woodside

Crews continue to work on the Talbot Avenue bridge and adjacent streets. Work includes building the ramp from Talbot Avenue to the new bridge and reconstruction of surrounding roads. Grace Church Road continues to be closed to through traffic at the bridge location. Work may occur 7 a.m. to 7 p.m., weekdays and weekends, as needed.   

Greater
Lyttonsville / Woodside

Crews continue construction of walls and installation of stormwater drainage adjacent to the CSX tracks between Talbot Avenue and the Silver Spring Transit Center.  Work may take place 7 a.m. to 7 p.m. weekdays and weekends, as needed through September.

Greater
Lyttonsville / Woodside

Talbot Avenue between Michigan Avenue and Lanier Drive remains closed to through traffic for roadway reconstruction until approximately October, 2023. Local access will be maintained for residents; on street parking will be restricted in the work zone.  This work may take place 7 a.m. to 7 p.m. weekdays and weekends, as needed, weather permitting. 

Greater
Lyttonsville / Woodside

Crews continue construction of retaining walls and the installation of utilities along the alignment from Rock Creek to Talbot Avenue through September. Work may take place 7 a.m. to 7 p.m. weekdays and weekends, as needed.

Long
Branch

Crews implemented a long-term closure of Arliss Street between Piney Branch Road and Garland Avenue to allow crews to install utilities and construct the Purple Line's Long Branch Station. A temporary driveway has been constructed to the Flower Branch Apartments, and a detour for vehicles and pedestrians is in place. The Long Branch Library will be accessed by turning north on Flower Avenue and east on Plymouth Street. Please follow the posted signage. Work may occur 7 a.m. to 7 p.m., weekdays and weekends, as needed through August 2024.  View detour here

Long
Branch

Crews continue work on the Plymouth Tunnel and the Manchester Place Station through September. Work will include construction of the concrete west portal at Wayne Avenue, utility work and preparation for track installation within the tunnel.  The work zone for the upper section of the Manchester Place Station located on Plymouth Street in Silver Spring will be accessed via Plymouth Street, residential parking will not be impacted.   Work may take place 7 a.m. to 7 p.m. weekdays and weekends, as needed.

Long
Branch

Crews continue work along Piney Branch Road(MD 320) from Greenwood Avenue to University Boulevard (MD 193) through September. Crews will be constructing walls and reconstructing the sidewalk and curbing. Pedestrian access will be maintained using temporary detours; please follow onsite signage. Access to driveways and businesses on will be maintained. Work may occur 7 a.m. to 7 p.m., weekdays and weekends, as needed.

Long
Branch

Crews will continue work where Long Branch waterway crosses under Piney Branch Road to install  stormwater drainage systems and complete a new fish passage and other improvements. This work is expected to continue through September. Pedestrian walkways and access to the Long Branch Community Center will remain open during construction. Work may occur 7 a.m. to 7 p.m., weekdays and weekends, as needed.

Riverdale
Park

On or about September 6 through 8, 2023, Purple Line crews will complete the concrete placement for the aerial Riverdale Park – Kenilworth station located adjacent to Riverdale Road. For safety, this operation will require reducing lanes to one lane in each direction on East-West Highway and Riverdale Road between Kenilworth Avenue and 58th Avenue. Lane closures will begin at 11 p.m. and continue until 10 a.m. for two nights. Please follow on-site signage. 

Riverdale
Park

Crews implemented a long-term traffic shift on Riverdale Road (MD-410) between the Baltimore-Washington Parkway and Veterans Parkway to allow the construction of the Beacon Heights-East Pines Station. The travel lanes have been shifted to the north onto new pavement. Two lanes in each direction and pedestrian access will be maintained. View here

Riverdale
Park

Crews continue work on the Purple Line Riverdale Park North-UMD station located near the traffic circle at River Road and Haig Drive through September. Pedestrian detours may occur intermittently near the station site. Bus stops will not be impacted. Please follow posted signage.  Work may occur 7 a.m. to 7 p.m., weekdays and weekends, as needed.

Riverdale
Park

Work continues along Kenilworth Avenue (MD 201) between River Road and the East-West Highway (MD 410) through September. Work includes stormwater drainage  installation and roadway work in preparation of track installation. Access to driveways, businesses and bus service will be maintained. Work may occur 7 a.m. to 7 p.m. weekdays and weekends, as needed. 

Riverdale
Park

Crews have implemented the next phase of the long-term traffic shift on Kenilworth Avenue (MD 201) from River Road to East-West Highway (MD 410), impacting the southbound travel lanes. A work zone in the middle lanes of Kenilworth Avenue has been established for the construction of a bridge leading to the new Riverdale Park-Kenilworth Station.  Access to businesses and resident's properties along with pedestrian access on Kenilworth Avenue (MD 201) will be maintained. Street parking in work zones will be prohibited. Please follow posted signage. Work may occur 7 a.m. to 7 p.m., weekdays and weekends, as needed. View here

Riverdale
Park

Crews will continue to use Patterson Street via 66th street to access work sites adjacent to Veterans Parkway. Work may occur 7 a.m. to 7 p.m. weekdays and weekends, as needed through September.   

Riverdale
Park

Crews continue utility installation, track preparations and roadway work along eastbound Riverdale Road (MD 410) between Mustang Drive and  Eastpine Drive through September. Work may take place 7 a.m. to 7 p.m. with periodic work, including lane closures during the overnight hours between 7 p.m. and 7 a.m. weekdays and weekends, as needed, weather permitting. 

Riverdale
Park

Crews continue work on the Riverdale Park-Kenilworth elevated station located at the corner of Riverdale Road (MD 410) and Kenilworth Avenue (MD 201) through September.  The work may take place 7 a.m. to 7 p.m. weekdays and weekends, as needed, weather permitting.  

Riverdale
Park

Crews continue work in the area of the Baltimore-Washington Parkway and Riverdale Road (MD 410).  The work will may take place 7 a.m. to 7 p.m. weekdays and weekends, as needed, weather permitting.

Silver
Spring

On or about September 29, 2023, crews will implement a long-term traffic shift on E. Wayne Avenue (MD 594A) from Sligo Creek Parkway to Manchester Place. A work zone on the north side of E. Wayne Avenue will be established, with one lane in each direction maintained on the south side for westbound and eastbound traffic. Pedestrians will be detoured to the south side of E. Wayne Avenue between Manchester Place and Sligo Creek Parkway. This traffic pattern will be in place for approximately one year.  Work may occur 7 a.m. to 7 p.m., weekdays and weekends, as needed. Please follow posted signage. View here

Silver
Spring

During the month of September crews will be periodically working nights and weekends on the property of the Silver Spring International Middle School. This is required to avoid disruptions to students during school hours. Noisy work will be prioritized during daytime hours and limited to before 10 p.m. 

Silver
Spring

The long-term pedestrian detour remains in effect for the crosswalks across Georgia Avenue (MD 29) at Bonifant Street. Pedestrians will be directed to use the crosswalk located a block south at Thayer Avenue. Please follow posted signage for the pedestrian detour. Bonifant Street (East) will remain open to eastbound vehicular traffic and pedestrians. Access to all businesses along Bonifant Street will be maintained during construction.  Construction will continue Bonifant Street East and West through the remainder of 2023.  View detour here

Silver
Spring

Crews continue work on the Purple Line’s Silver Spring Library station located at the Brigadier General Charles E. McGee Library. Access to the library and businesses surrounding the library including Bonifant Street will be maintained at all times. ADA-compliant pedestrian access will be maintained to and around the library via Wayne Avenue and Fenton Street. Pedestrian pathways may change intermittently around the work zone; please follow on-site signage. Fencing has been installed to delineate the work zone to allow excavation, utility relocations, systems, and trackwork. Access to Bonifant Street will remain one-way, eastbound from Georgia Avenue. Construction may occur 7 a.m. to 7 p.m., weekdays and weekends, as needed through December 2023.

Silver
Spring

Purple Line work will continue around the Paul S. Sarbanes Transit Center as crews continue construction of  the  Purple Line Station and the Mezzanine to the Metro and MARC stations.  ADA-compliant pedestrian access will be maintained with intermittent changes to walkways around the work zone; please follow on-site signage. Access to the transit Center will be maintained at all times around the Purple Line work zone. Construction may occur 7 a.m. to 7 p.m., and 7 pm to 7 a.m. weekdays and weekends, as needed.

Silver
Spring

The long-term traffic configuration on Wayne Avenue (MD 595A) between Sligo Creek Parkway and Fenton Street, reducing the road to one lane in each direction remains in effect to allow for continued utility relocations, installation of stormwater systems and reconstruction of the curb, sidewalk, and roadway. Access to residents’ properties and driveways will be maintained, while street parking within the work zones is prohibited. Pedestrian access along Wayne Avenue will be maintained with at least one sidewalk open at all times. Please follow posted signage for pedestrian detours when applicable. Temporary lane closures will be implemented 9 a.m. to 3:30 p.m. while work in the area may occur 7 a.m. to 7 p.m., weekdays and weekends, as needed through the end of 2023. 

Silver
Spring

The pedestrian detour for the Sligo Creek Trail and Sligo Cabin Neighborhood Park remains in effect around the work zone and the adjacent parking lot. Please follow posted signage. Work may occur 7 a.m. to 7 p.m., weekdays and weekends, as needed for the remainder of 2023. 

Silver
Spring

Crews continue utility relocations on Wayne Avenue (MD 594A) from Sligo Creek Parkway to Flower Avenue. Temporary lane closures may occur 7 a.m. to 5 p.m., weekdays and 7 a.m. to 7 p.m. weekends, as needed through September. Overnight work will occur intermittently, as scheduled by utility companies. Flagging operations will be utilized on E. Wayne Avenue between Sligo Creek Parkway and Manchester Road, motorists should plan for and expect delays. Temporary sidewalk closures will occur as needed. 

Silver
Spring

The long-term traffic pattern implemented on Bonifant (East) between Georgia Avenue and Fenton Street remains in effect to reduce the road to a one-way eastbound street. Additional lane closures, reduced on-street parking, and intermittent sidewalk closures may also occur. Flagging operations may be utilized when needed. ADA-compliant pedestrian, vehicular, and business access will be maintained at all times. Work on Bonifant may take place 7 a.m. to 5 p.m. weekdays and weekends, as needed. 

Silver
Spring

The long-term lane closure of Bonifant Street (west) between Ramsey Street and Georgia Avenue will remain in effect for construction. Pedestrian access will be maintained during the road closure. Pedestrians must obey construction signs and stay out of the work zone for their safety and the safety of the construction crew.

Silver
Spring

Crews continue work on the Plymouth Tunnel and the Manchester Place Station through September. Work will include construction of the concrete west portal at Wayne Avenue, utility work and preparation for track installation within the tunnel.  The work zone for the upper section of the Manchester Place Station located on Plymouth Street in Silver Spring will be accessed via Plymouth Street, residential parking will not be impacted.   Work may take place 7 a.m. to 7 p.m. weekdays and weekends, as needed.

Silver
Spring

Crews continue construction of walls and installation of  utilities  adjacent to the CSX tracks between Talbot Avenue and the Silver Spring Transit Center.  Work may take place 7 a.m. to 7 p.m. weekdays and weekends, as needed through September.

University
Boulevard

On or about September 13, 2023, Purple Line crews will begin storm drain installation on the service road along westbound University Boulevard E between Navahoe Drive and Carroll Avenue. NO PARKING will be allowed on the service road for the duration of work. The service road will remain open for local access only. This work is scheduled for approximately three weeks. Work may take place 7 a.m. to 7 p.m. weekdays and weekends, as needed.

University
Boulevard

A long-term lane closure for the eastbound right lane of University Boulevard (MD 193) between New Hampshire Ave (MD 640) and Riggs Rd (MD 212)  is in effect to facilitate storm drain crossings through September. Access to driveways and businesses will be maintained. Work may occur 7 a.m. to 7 p.m. weekdays and weekends, as needed.

University
Boulevard

The long-term lane closure of the righthand eastbound turn lane from University Boulevard (MD 193) onto New Hampshire Avenue (MD 650) will continue through September. Turning vehicles will use the thru lane to turn during this phase. The closure will be implemented to facilitate ongoing storm drain installation, utility relocations and the construction of a retaining wall. Please follow posted signage around the work zone. Work may take place 7 a.m. to 7 p.m. weekdays and weekends, as needed, until the end of 2023.

University
Boulevard

The long-term lane closure of the righthand eastbound turn lane from University Boulevard (MD 193) onto Riggs Road (MD 212) will continue through September. Turning vehicles will use the thru lane to turn during this phase. The closure will be implemented to facilitate ongoing storm drain installation and utility relocations. Please follow posted signage around the work zone. Work may take place 7 a.m. to 7 p.m. weekdays and weekends, as needed, until the end of 2023.

University
Boulevard

The long-term lane closure of the rightmost westbound lane of University Boulevard (MD 193) from Edwards Place until New Hampshire Avenue (MD 650) will continue through September. This closure will also affect the right turn lane from University Boulevard (MD 193) and the rightmost northbound lane of New Hampshire Avenue (MD 650). This closure will take place to facilitate ongoing stormwater drainage system installation. Please follow posted signage. Work may take place weekdays and weekends, for approximately six weeks.  

University
Boulevard

The long-term lane closure on University Boulevard (MD 193) between 24th Avenue and Riggs Road (MD 212) impacting the westbound righthand lane remains in effect through September. Access to businesses and resident's properties along with pedestrian access on University  Boulevard (MD 193) will be maintained. Please follow posted signage. Work may occur 7 a.m. to 7 p.m., weekdays and weekends, as needed.

University
Boulevard

A long-term lane closure for the eastbound right lane of University Boulevard (MD 193) between Piney Branch Road (MD 320) and Carroll  Avenue remains in effect to facilitate utility relocations through September. Access to driveways and businesses will be maintained. Work may occur 7 a.m. to 7 p.m. weekdays and weekends, as needed.

University
Boulevard

The long-term closure of the University Boulevard (MD 193) service road between Edwards Place and 15th Avenue will continue for the installation of storm drain systems through the end of 2023. Street parking in the work zone will be prohibited, please follow posted signage. Residential and pedestrian access will be maintained. Work may occur 7 a.m. to 7 p.m., weekdays and weekends, as needed

University
Boulevard

Crews continue sidewalk, curbing and driveway work along the University Boulevard (MD 193) service road between 24th Avenue and West Park Drive through September. During work hours, the service road will be limited to one lane. Parking will be prohibited in the areas adjacent to the work zones to allow through traffic to continue to use the service road. Work may take place from 7 a.m. to 7 p.m. weekdays and weekends, as needed.

University
Boulevard

The long-term traffic switch on University Boulevard (MD 193) between Tulane Drive and 24th Avenue remains in effect through September. Two lanes in each direction and pedestrian access will be maintained, including a temporary channelized pedestrian pathway. The work zone facilitates the construction of the south bridge over the Northwest Branch of the Anacostia River. Work includes demolition of the existing bridge, foundation work and concrete for the new bridge.  Work may occur 7 a.m. to 7 p.m., weekdays and weekends, as needed.

University
Boulevard

A long-term lane closure for the westbound right lane of University Boulevard (MD 193) between Carroll Avenue and Piney Branch Road (MD 320) remains in effect to facilitate utility relocations through September. Access to driveways and businesses will be maintained. Work may occur 7 a.m. to 7 p.m. weekdays and weekends, as needed.