The table below is a list of active construction along the Purple Line alignment. Notifications can be sorted by work zone for updates on specific locations and also received via text and email through Purple Line Transit Partners’ notification system. Sign up to receive these alerts.

ZoneConstruction DatesLocationDescription
A Full ProjectDuration of the ProjectAcross the AlignmentAs work continues along the alignment, the Purple Line construction team is committed to keeping everyone safe. Pedestrians are advised to follow any construction signs and use the open sidewalk(s). Pedestrians are not allowed in the construction work zones. This is for your safety as well as our construction team.
A Full ProjectDuration of the ProjectAcross the AlignmentThroughout construction the Purple Line will maintain access to all businesses along the alignment for customers as well as business deliveries.
A Full ProjectDuring Summer MonthsAcross the AlignmentConstruction work hours alignment wide are 7 a.m. - 7 p.m. unless night hours are noted. Lane closure hours are included in notifications specific to each area as permitted.
Bethesda / Chevy ChaseBeginning on or about September 21, 2020In the area of the Columbia Country ClubBeginning on or about September 21, 2020, crews will be performing night work in the area of the Columbia Country Club for approximately three nights. This work will take place from 8 p.m. to 4 a.m.
Bethesda / Chevy ChaseBeginning on or about September 8, 2020Along the Georgetown Branch Trail between Pearl Street and East-West HighwayBeginning on or about September 8, 2020, crews will be pile driving along the Georgetown Branch Trail between Pearl Street and East-West Highway for approximately three weeks. Pile driving may take place from 8 a.m. to 5 p.m. Monday through Friday.
Bethesda / Chevy ChaseBeginning on or about September 14, 2020Connecticut Avenue between Newdale Road and Chevy Chase Lake DriveThe closure that was scheduled to begin on August 10 has been rescheduled to September 14, 2020. the Purple Line will implement a nightly closure of Connecticut Avenue between Newdale Road and Chevy Chase Lake Drive. The closures will occur from 9 p.m. to 5 a.m. for approximately five nights for bridge girder installation. The detour can be viewed here: https://plmdnews.com/x01
Bethesda / Chevy ChasePostponedBethesda Work Zone (Elm Street)Blasting in the Bethesda Shaft has been postponed until further notice.
Bethesda / Chevy ChaseDuring the month of SeptemberSleaford Road Work Zone to Montgomery AvenueDuring the month of September, crews will be working along East-West Highway between Connecticut Avenue and Montgomery Avenue. Work may occur from 7 a.m. to 7 p.m. on weekdays and weekends. Temporary lane closures will occur.
Bethesda / Chevy ChaseDuring the month of SeptemberJones Mill RoadDuring the month of September, traffic continues to be shifted onto the southbound side of Jones Mill Road for phase I of the traffic change. Work will take place from 7 a.m. to 7 p.m. on weekdays and weekends.
Bethesda / Chevy ChaseDuring the month of SeptemberRock Creek Park between the Rays Meadow Park and Susanna Lane Access PointsDuring the month of September, crews will be working in the area of the Rock Creek Park bridge from 7 a.m. to 7 p.m. on weekdays and weekends. Temporary trail closures will occur.
Bethesda / Chevy ChaseDuring the month of SeptemberBethesda Work Zone (Elm Street)During the month of September, crews will be working at the Bethesda Work Zone on Elm Street. Work may occur from 7 a.m. to 5 p.m. and 5 p.m. to 7 a.m. on weekdays and weekends.
Bethesda / Chevy ChaseDuring the month of SeptemberWisconsin Avenue between Montgomery Lane and Bethesda AvenueDuring the month of September, southbound lanes along Wisconsin Avenue between Montgomery Lane and Bethesda Avenue will experience temporary closures. Work will take place from 9 p.m. to 5 a.m. on weekdays and weekends.
Bethesda / Chevy ChaseDuring the month of SeptemberGeorgetown Branch Trail between Wisconsin Avenue and Connecticut AvenueDuring the month of September, crews will be working along the Georgetown Branch Trail between Wisconsin Avenue and Connecticut Avenue. Work may take place on weekdays and weekends from 7 a.m. to 7 p.m.
Bethesda / Chevy ChaseDuring the month of SeptemberConnecticut Avenue between Jones Bridge Road and East-West HighwayDuring the month of September, crews will be working on Connecticut Avenue between Jones Bridge Road and East-West Highway. Work may occur from 7 a.m. to 5 p.m. and 5 p.m. to 7 a.m. on weekdays and weekends. Temporary lane closures with flagging operations will occur.
Bethesda / Chevy ChaseDuring the month of SeptemberGeorgetown Branch TrailDuring the month of September, crews will continue work along the Georgetown Branch Trail from Wisconsin Avenue to Jones Mill Road. Work may occur from 7 a.m. to 5 p.m. and 5 p.m. to 7 a.m. on weekdays and weekends.
Bethesda / Chevy ChaseDuring the month of SeptemberJones Mill Road and Jones Bridge RoadDuring the month of September, crews will be working along Jones Bridge Road between Altimont Lane and Jones Mill Road, as well as Jones Mill Road between Flushing Meadow Terrace and Coquelin Terrace. Temporary lane closures will take place from 7 a.m. to 4 p.m. on weekdays and weekends.
Bethesda / Chevy ChaseOngoingFuture CCTThe CCT is currently closed to public access between Woodmont Avenue in Bethesda and Talbot Avenue in Silver Spring.
College ParkOn August 24, 2020Campus Drive between the Paint Branch Trail and River RoadOn August 24, 2020, crews began flagging on Campus Drive between the Paint Branch Trail and River Road for construction. From 9 a.m. to 5 p.m. and 7 p.m. to 6 a.m. traffic may be reduced to one lane for construction.
College ParkOn November 11, 2019Campus Drive between Paint Branch Trail and River RoadOn November 11, 2019, the Purple Line implemented a long-term sidewalk closure on Campus Drive between the Paint Branch Trail and River Road. A signed detour is in place to guide bicyclists and pedestrians, that includes the use of stairs and elevators to cross the train tracks at the College Park Metro station. A paratransit service is available, for those who are unable to use the stairs at the College Park Metro station, while the elevator is not operational. The paratransit service will operate Monday-Thursday from 11:30 p.m. to 5 a.m., Friday from 1 a.m. to 7 a.m., Saturday from 1 a.m. to 8 a.m. and Sunday from 11 p.m. to 5 a.m. Vehicles will operate in continuous loops alternating from one side of the closure to the other. The Detour can be viewed here: https://rebrand.ly/6c31sb
College ParkOn March 9, 2020Presidential Drive between Campus Drive and Championship LaneOn March 9, 2020, crews closed a section of Presidential Drive between Campus Drive and Ehrensberger Drive for utility relocations. The closure will last for approximately 10 months. Work may occur from 7 a.m. to 5 p.m. and 5 p.m. to 7 a.m. on weekdays and weekends.
College ParkDuring the month of SeptemberCampus Drive between Adelphi Road and Alumni DriveDuring the month of September, crews will be working along Campus Drive between Adelphi Road and Alumni Drive. Work may occur from 7 a.m. to 5 p.m. and 5 p.m. to 7 a.m. on weekdays and weekends. Temporary lane closures will occur. On March 9, 2020 crews closed the eastbound and westbound right-hand lane on Campus Drive. One lane will remain open in each direction.
College ParkDuring the Month of SeptemberCampus Drive between Regents Drive and Baltimore AvenueDuring the month of September, crews will be working along Campus Drive between Regents Drive and Baltimore Avenue. Work may occur from 7 a.m. to 5 p.m. and 5 p.m. to 7 a.m. on weekdays and weekends. Temporary lane closures will occur.
College ParkDuring the Month of SeptemberRivertech Court near the intersection at River RoadDuring the month of September, crews will be working along Rivertech Court near the intersection at River Road. Work may occur from 7 a.m. to 5 p.m. and 5 p.m. to 7 a.m. on weekdays and weekends. Temporary lane closures will occur.
College ParkOn July 21, 2019River Road Between Rivertech Court and Kenilworth AvenueOn July 21 2019, the Purple Line implemented a long-term lane closure along River Road between Rivertech Court and Kenilworth Avenue. One lane of traffic is maintained in each direction.
College ParkDuring the Month of SeptemberRiver Road between Campus Drive and Kenilworth AvenueDuring the month of September, crews will be working along River Road between Campus Drive and Kenilworth Avenue. Work may occur from 7 a.m. to 5 p.m. and 5 p.m. to 7 a.m. on weekdays and weekends. Temporary lane closures will occur.
College ParkDuring the Month of SeptemberCampus Drive near College Park Metro StationDuring the month of September, crews will be working at the pump station along Campus Drive adjacent to the Maryland Fire and Rescue Institute. Work may occur on weekdays and weekends from 7 a.m. to 7 p.m.
College ParkOn September 1, 2019College Park Metro along Campus DriveOn September 1, 2019, the Purple Line closed the College Park Metro Bus Loop long-term for construction. The bus stops within the bus loop have been relocated to temporary bus shelters along River Road. Please note that buses will queue up at the temporary bus stops from 5 a.m. from 11 p.m. A graphic of the closure can be viewed here: rebrand.ly/hbpq4s
College Park During the Month of SeptemberCampus Drive between Baltimore Avenue and River RoadDuring the month of September, crews will be working along Campus Drive between Baltimore Avenue and River Road. Work may occur from 7 a.m. to 5 p.m. and 5 p.m. to 7 a.m. on weekdays and weekends. Temporary lane closures will occur.
Glenridge / New Carrollton MetroPostponedThe intersection of Ellin Road and Veterans ParkwayThe Traffic shift scheduled for July 31, 2020 has been postponed.
Glenridge / New Carrollton MetroOn February 17, 2020The Intersection of Ellin Road and Hanson Oaks DriveOn February 17, 2020, crews began working at the intersection of Ellin Road and Hanson Oaks Drive, relocating utilities. Work may occur from 7 a.m. to 7 p.m. and from 7 p.m. to 7 a.m. on weekdays and weekends for approximately seven months. Flagging operations will occur and access to the neighborhood will be maintained at all times.
Glenridge / New Carrollton MetroDuring the month of SeptemberEllin Road between Hanson Oaks Drive and Emerson PlaceDuring the month of September, traffic will remain shifted along Ellin Road between Hanson Oaks Drive and Emerson Place, for utility relocations. One lane will remain open in each direction and access to the Hanson Oaks neighborhood will be maintained at all times.
Glenridge / New Carrollton MetroBeginning on December 02, 2019New Carrollton Metro Station along Ellin RoadWork continues in the first of several phases of construction adjacent to the New Carrollton Metro Station along Ellin Road.
Glenridge / New Carrollton MetroDuring the month of SeptemberAnnapolis Road at the intersection of Veterans ParkwayDuring the month of September, crews will be working along Annapolis Road at the intersection of Veterans Parkway. Work will take place from 7 a.m. to 5 p.m. on weekdays and weekends. Temporary lane closures will occur.
Glenridge / New Carrollton MetroOn April 22,2019Ellin Road between Hanson Oaks Drive and Emerson PlaceOn April 22, 2019, the Purple Line implemented a long-term lane closure of the westbound lanes on Ellin Road between Hanson Oaks Drive and Emerson Place. The closure can be viewed here: https://plmdnews.com/6f5
Glenridge / New Carrollton MetroDuring the month of September`Glenridge YardDuring the month of September, crews will continue construction of the Operations and Maintenance Facility at the Glenridge Yard. Work may occur from 7 a.m. to 7 p.m. and 7 p.m. to 7 a.m. on weekdays and weekends.
Glenridge / New Carrollton MetroOn October 1, 2018Ellin Road between Veterans Parkway and Hanson Oaks DriveOn October 1, 2018, the Purple Line implemented a long-term closure of Ellin Road between Veterans Parkway and Hanson Oaks Drive. Work will take place from 7 a.m. to 5 p.m. on weekdays and weekends.
Glenridge / New Carrollton MetroOn January 17, 2019Veterans Parkway between Riverdale Road and Annapolis RoadOn January 17, 2019, the Purple Line implemented a long-term lane closure of the right-hand southbound lane on Veterans Parkway between Riverdale Road and Annapolis Road. Barriers have been placed to delineate the construction zone.
Greater Lyttonsville / WoodsideOn or about June 12, 2020Georgetown Branch Trail between Jones Mill Road and the Rock Creek BridgeOn or about June 12, 2020, crews began pile driving along the Georgetown Branch Trail between Jones Mill Road and the Rock Creek Bridge. Pile driving may take place from 8 a.m. to 5 p.m. on weekdays until approximately September 31, 2020. The work zone can be viewed here: https://plmdnews.com/3k1
Greater Lyttonsville / WoodsideBeginning on or about May 26, 2020Talbot Avenue to 16th StreetOn or about May 26, 2020, crews began pile driving along the CSX tracks between Talbot Avenue and Spring Street. Pile driving may take place from 8 a.m. to 5 p.m. on weekdays for approximately four months.
Greater Lyttonsville / WoodsideOn August 19, 2020Lyttonsville Bridge AreaOn August 19, 2020, crews began pile driving in the area of the Lyttonsville Place Bridge. Pile driving may take place from 8 a.m. to 5 p.m. on weekdays for approximately ten weeks.
Greater Lyttonsville / WoodsideAs of April 1, 20204th Avenue between Hanover Street and Grace Church RoadThe Purple Line implemented a closure of 4th Avenue between Hanover Street and Grace Church Road that will continue through December of 2020, for construction of the Talbot Avenue Bridge. Work may occur from 7 a.m. to 7 p.m. on weekdays and weekends. Access to residential driveways will be maintained.
Greater Lyttonsville / WoodsideDuring the month of SeptemberTalbot Avenue BridgeDuring the month of September, crews will continue work to build the new Talbot Avenue Bridge from 7 a.m. to 7 p.m. on weekdays and weekends.
Greater Lyttonsville / WoodsideDuring the month of SeptemberThe CSX corridor between Stewart Avenue and 16th StreetDuring the month of September, crews will be working along the railroad tracks between Stewart Avenue and 16th Street. Work will take place from 7 a.m. to 7 p.m. on weekdays and weekends.
Greater Lyttonsville / WoodsideDuring the month of SeptemberGeorgetown Branch Trail between Grubb Road and Stewart AvenueDuring the month of September, crews will be working along the Georgetown Branch Trail between Grubb Road and Stewart Avenue. Work will take place from 7 a.m. to 7 p.m. on weekdays and weekends.
Greater Lyttonsville / WoodsideDuring the month of SeptemberLyttonsville Bridge AreaDuring the month of September, crews will continue work in the area of the Lyttonsville Place Bridge from 7 a.m. to 7 p.m. on weekdays and weekends.
Greater Lyttonsville / WoodsideOngoingFuture CCTThe CCT is currently closed to public access between Woodmont Avenue in Bethesda and Talbot Avenue in Silver Spring.
Greater Lyttonsville / WoodsideOn June 4, 2019Talbot Avenue BridgeOn June 4, 2019, the Purple Line implemented a long-term closure of the Talbot Avenue Bridge for the demolition and construction of the new bridge.
Long BranchPostponedArliss Street between Flower Avenue and Piney Branch RoadThe closure and associated detour of Arliss Street scheduled to Begin on August 21, 2020 has been postponed.
Long BranchOn February 17, 2020Piney Branch Road between Greenwood Avenue and University BoulevardOn February 17, 2020, the eastbound lanes on Piney Branch Road were shifted north to allow for construction. Two lanes remain open in each direction. The traffic shift will last for approximately one year.
Long BranchDuring the month of SeptemberWayne Avenue between Fenton Street and Flower AvenueDuring the month of September, crews will be relocating utilities along Wayne Avenue between Fenton Street and Flower Avenue. Work will take place from 7 a.m. to 5 p.m. on weekdays and weekends. Temporary lane closures will occur.
Long BranchDuring the month of SeptemberPlymouth Street TunnelDuring the month of September, crews will continue work at the Plymouth Street Tunnel and Manchester Place Station. Work may occur from 6 a.m. to 11 p.m. on weekdays and weekends.
Long BranchOngoingPlymouth StreetPlymouth Street is closed to non-local traffic between Bradford and Hartwell Roads to allow for the construction of the Purple Line's Manchester Station. The haul road and entrance to the construction site will be located on East Wayne Avenue.
Long BranchOngoingArliss StreetArliss Street is closed between Flower Avenue and Walden Road. Access to local properties will be maintained.
Long BranchOngoingArliss StreetFor convenience, a new temporary driveway from Flower Avenue to the Giant Food Shopping center has been constructed.
Riverdale ParkOn or about June 22, 2020Quintana Street at the intersection with Kenilworth AvenueOn or about June 22, 2020, crews closed Quintana Street at Kenilworth Avenue for road reconstruction until approximately October 1, 2020. The detour can be viewed here: https://plmdnews.com/1p2
Riverdale ParkPostponedQuesada Road at the intersection of Kenilworth AvenueThe detour of Quesada Road scheduled to begin on August 21, 2020, has been postponed.
Riverdale ParkOn July 8, 2019Kenilworth Avenue between River Road and Riverdale RoadOn July 8, 2019, the Purple Line implemented a long-term closure of the right-hand southbound lane on Kenilworth Avenue between River Road and Riverdale Road. Barriers will be used to delineate the work zone. Pedestrians and bicyclists are required to stay outside of the construction zone at all times. Work will take place from 7 a.m. to 5 p.m. on weekdays and weekends.
Riverdale ParkDuring the month of SeptemberBaltimore-Washington Parkway at the Riverdale Road OverpassDuring the month of September, crews will continue work on the Baltimore-Washington Parkway in the area of the Riverdale Road overpass. Work will take place from 7 a.m. to 5 p.m. on weekdays and weekends. Temporary lane closures will occur.
Riverdale ParkDuring the month of SeptemberRiverdale Road between the Baltimore-Washington Parkway and 67th PlaceDuring the month of September, crews will be relocating utilities along Riverdale Road between the Baltimore-Washington Parkway and 67th Place. To conduct this work, lanes will intermittently be closed on 66th Avenue and 67th Avenue. Work will take place from 7 a.m. to 5 p.m. on weekdays and weekends. Temporary lane closures with flagging operations will occur.
Riverdale ParkDuring the month of SeptemberKenilworth Avenue between River Road and Riverdale RoadDuring the month of September, crews will be working along Kenilworth Avenue between River Road and Riverdale Road. Work may occur from 7 a.m. to 5 p.m. and 5 p.m. to 7 a.m. on weekdays and weekends. Temporary lane closures will occur.
Riverdale ParkDuring the month of SeptemberRiverdale Road between Kenilworth Avenue and Veterans ParkwayDuring the month of September, crews will be working along Riverdale Road between Kenilworth Avenue and Veterans Parkway. Work may occur from 7 a.m. to 5 p.m. and 5 p.m. to 7 a.m. on weekdays and weekends. Temporary lane closures will occur.
Silver SpringBeginning on May 11, 2020Bonifant Street between Ramsey Street and Georgia AvenueOn May 11, 2020, the Purple Line implemented a closure of Bonifant Street (west) between Ramsey Street and Georgia Avenue for construction. The closure will be in place for approximately 18 months and will remain in place until work is complete. Pedestrian access will be maintained during the road closure. Pedestrians must obey construction signs and stay out of the work zone for their safety and the safety of the construction crew. The detour can be viewed here: https://plmdnews.com/hie
Silver SpringOn March 24, 2020Wayne Avenue between Mansfield Road and Sligo Creek bridgeOn March 24, 2020, the Purple Line implemented a long-term closure of the right-hand eastbound lane along Wayne Avenue between Mansfield Road and Sligo Creek Parkway. The closure will last for approximately 6 months.
Silver SpringDuring the month of SeptemberWayne Avenue between Fenton Street and Mansfield RoadDuring the month of September, the right-hand westbound lane along Wayne Avenue between Fenton Street and Mansfield Road will remain closed. Work may occur from 7 a.m. to 5 p.m. and 5 p.m. to 7 a.m. on weekdays and weekends.
Silver Spring On June 10, 2019The Silver Spring Metrorail Station / Paul S. Sarbanes Transit CenterThe Purple Line has activated zones I, II, III, and IV of the long-term work zones adjacent to the Paul S. Sarbanes Transit Center. Wayfinding signage can be found posted around the work zones. Work may occur from 7 a.m. to 5 p.m. and 5 p.m. to 7 a.m. on weekdays and weekends. The work zones can be viewed here: http://rebrand.ly/68yfsv
Silver SpringDuring the month of SeptemberCSX tracks between Fenwick Lane and Apple AvenueDuring the month of September, crews will be working along the CSX tracks in the area of Fenwick Lane and Apple Avenue. Work will take place from 7 a.m. to 7 p.m. on weekdays and weekends.
Silver SpringDuring the month of SeptemberBonifant Street between Ramsey Avenue and Fenton StreetDuring the month of September, crews will be relocating utilities along Bonifant Street between Ramsey Avenue and Fenton Street. Work will take place from 7 a.m. to 7 p.m. and 7 p.m. to 7 a.m. on weekdays and weekends. Temporary lane closures with flagging operations will occur.
Silver SpringDuring the month of SeptemberPaul S. Sarbanes Transit CenterDuring the month of September, crews will be working in the area of the Paul S. Sarbanes Transit Center from East-West Highway to Wayne Avenue and from Colesville Road to Ripley Street. Work may occur from 7 a.m. to 7 p.m. and 7 p.m. to 7 a.m. on weekdays and weekends.
Silver SpringDuring the month of SeptemberWayne Avenue between Fenton Street and Flower AvenueDuring the month of September, crews will be working along Wayne Avenue between Fenton Street and Flower Avenue. Work will take place from 7 a.m. to 5 p.m. on weekdays and weekends. Temporary lane and sidewalk closures will occur. 
Silver SpringOngoingFuture CCTThe CCT is currently closed to public access between Woodmont Avenue in Bethesda and Talbot Avenue in Silver Spring.
University BoulevardOn July 7, 2020University Boulevard between the Northwest Branch Bridge and Temple StreetOn July 7, 2020, the Purple Line permanently reduced the service road along University Boulevard between the Northwest Branch Bridge and Temple Street to one lane for construction.
University BoulevardOn July 6, 2020Forston Street at the intersection of University BoulevardOn July 6, 2020, the entrance to Forston Street was closed along University Boulevard, the closure has been extended until approximately October 1, 2020, for utility relocations. The detour can be viewed here: https://plmdnews.com/d0s
University BoulevardOn April 29, 2020the service road adjacent to University Boulevard between Edwards Place and 15th AvenueOn April 29, 2020, the service road adjacent to University Boulevard between Edwards Place and 15th Avenue will be closed daily for Purple Line construction between the hours of 7 a.m. – 5 p.m. until approximately September 17, 2020. Access to businesses and residence will be maintained during this time.
University BoulevardOn April 17, 2020West Park Drive at the intersection of University BoulevardOn April 17, 2020, the Purple Line implemented a closure of West Park Drive at the intersection of University Boulevard for utility relocations. The closure will be in effect for approximately five months. The detour can be viewed here: https://plmdnews.com/ny9
University BoulevardOn April 13, 2020Edwards Place at the corner of University BoulevardOn April 13, 2020, the Purple Line implemented a closure of Edwards Place at the intersection of University Boulevard for utility relocations. The closure will be in effect until approximately September 15, 2020. The detour can be viewed here: https://plmdnews.com/fd6
University BoulevardDuring the month of SeptemberNorthwest Branch BridgeDuring the month of September, crews will be working along University Boulevard at the Northwest Branch Bridge between West Park Drive and Adelphi Road. Work will take place from 7 a.m. to 5 p.m. on weekdays and weekends.
University BoulevardDuring the month of SeptemberUniversity Boulevard between Riggs Road and Adelphi RoadDuring the month of September, crews will be relocating utilities along University Boulevard between Riggs Road and Piney Branch Road. Work may occur from 7 a.m. to 5 p.m. and 5 p.m. to 7 a.m. on weekdays and weekends. Temporary lane closures will occur from 8:30 a.m. - 4 p.m. One lane will remain open in each direction at all times, with two lanes open during peak hours. Pedestrians and bicyclists are required to stay outside of the construction zone at all times.
University BoulevardDuring the month of SeptemberUniversity Boulevard between Riggs Road and Adelphi RoadDuring the month of September, crews will be relocating utilities along University Boulevard between Riggs Road and Adelphi Road. Work may occur from 7 a.m. to 5 p.m. and 5 p.m. to 7 a.m. on weekdays and weekends. Temporary lane closures will occur. One lane will remain open in each direction at all times. Pedestrians and bicyclists are required to stay outside of the construction zone at all times.
University BoulevardDuring the month of SeptemberWest Park Drive between University Boulevard and Judson StreetDuring the month of September, temporary lane closures will occur on West Park Drive between University Boulevard and Judson Street. Work will take place from 7 a.m. to 5 p.m. on weekdays and weekends.
University BoulevardOn February 10, 2020University Boulevard between Navahoe Drive and Lebanon StreetOn February 10, 2020, crews began working in the service road adjacent to University Boulevard between Navahoe Drive and Lebanon Street. Temporary lane closures will occur.