View Construction Updates
4/18/24. Street-level view of the Kenilworth Avenue flyover.
4/18/24. View from on top of the Kenilworth Avenue Flyover.
4/22/24. Ballast track outside the Glenridge Operations and Maintenance Facility along Veterans Parkway.
3/7/24. Embedded track on Campus Drive at the University of Maryland.
4/26/24. The Kenilworth Avenue flyover, shown from Riverdale Road.
Paving between the embedded tracks installed on Union Drive in the University of Maryland. 3/12/24
The new 64th Avenue will cross the newly installed tracks. 2/20/24
Tracks along Veterans Parkway extend from Ellin Road towards Annapolis Road. 3/7/24
Crews use two cranes to carefully install the Beacon Heights Station canopy. 2/19/24
The Glenridge Station canopy, complete with fritted glass. 2/12/24
4/22/24. Ballast track underneath East-West Highway near Bethesda.
4/22/24. Crews work on a concrete bridge slab at the Chevy Chase Lake development.
2/20/24. Crews work on a platform at the Silver Spring station.
3/5/24. The Manchester Place station platform at the west end of the Plymouth Tunnel.
3/5/24. Walls to surround the Traction Power Substation at Silver Spring International Middle School.
Crews work on walls and pedestrian infrastructure in Bethesda. 2/2/24
The Connecticut Avenue Station is taking shape in Chevy Chase. 2/5/24
The Silver Spring Library Station is taking shape under Brigadier General Charles E. McGee Library. 2/8/24
Specialized formwork is moved into the Bethesda shaft to form the Cavern Roof. 2/12/24
Crews place the concrete for the Silver Spring Station platforms. 2/20/24